    LNG Bunkering Guidelines (IACS Rec 142)

    £25.00
    These guidelines provide recommendations for the responsibilities, procedures and equipment required for LNG bunkering operations and sets harmonised minimum baseline recommendations for bunkering risk assessment, equipment and operations.
    ISBN: 9781856097543
    *

    Please select the required format.

    Ship to
    *
    *
    Shipping Method
    Name
    Estimated Delivery
    Price
    No shipping options

    Author: IACS

    Published: November 2017

    The purpose of these guidelines is mainly to define and cover the additional risks associated with bunkering LNG and to propose a methodology to deal with those additional risks in order to provide a similar level of safety as is achieved for traditional oil fuel bunkering operations. This document is designed to complement the requirements from the existing applicable guidelines and regulations, such as port and terminal checklists, operator’s procedures, industry guidelines and local regulations. This guide provides guidance to clarify the gaps that have been identified in the existing guidance and regulations. In particular, the following items are covered:

    • The responsibility of different parties involved in the LNG transfer,

    • The LNG bunkering process,

    • SIMOPS

    • Safety distances,

    • QRA and HAZID.

    Witherby Connect is the new online library solution for the maritime industry. Created by Witherbys’ in-house development team, Witherby Connect provides users with streamlined access to all major industry publications.

    The browser-based hybrid software means that there is nothing to install and after publications are saved to the browser cache they can be accessed almost instantly both on and offline. This solution delivers more flexibility and security for those working at sea.

    Use on and offline: Witherby Connect provides flexible access. Publications can be viewed while connected to the internet and are downloaded to the browser’s cache for access offline, making it suitable for use even when internet access cannot be guaranteed.

    You can access Witherby Connect on any modern browser including: Google Chrome, Microsoft Edge, Mozilla Firefox and Apple Safari.

    Author: IACS

    Published: November 2017

    The purpose of these guidelines is mainly to define and cover the additional risks associated with bunkering LNG and to propose a methodology to deal with those additional risks in order to provide a similar level of safety as is achieved for traditional oil fuel bunkering operations. This document is designed to complement the requirements from the existing applicable guidelines and regulations, such as port and terminal checklists, operator’s procedures, industry guidelines and local regulations. This guide provides guidance to clarify the gaps that have been identified in the existing guidance and regulations. In particular, the following items are covered:

    • The responsibility of different parties involved in the LNG transfer,

    • The LNG bunkering process,

    • SIMOPS

    • Safety distances,

    • QRA and HAZID.